Burra Burra Copper-mining Company, No Liability
Mount Boppy, week ended December 9. -Main shaft
total 215ft.; still in sulphides and malleable ore which is
improving as depth is attained. North drive carries a good
face of sulphides and veins of black ore occasionally and
looks well. Winze, total 147ft. from the brace; the
country has changed to a mixture of blue slate carrying
sulphides, being similar to the same level in the main
shaft.
No comments:
Post a Comment